No signup to post · no site visit to start · local crews bid
Get a project estimate
Three answers, no site visit. The range is a model estimate from the same engine that prices tree work by the acre; local crews bid the real number.
About the land
Clearing is priced by what is standing on the ground, not by one tree. These three answers are what a company needs to bid without walking it first.
Roughly how big is the area?
acres
A rough number is fine. Not sure? A typical suburban lot is about a quarter of an acre; a football field is a little over one.
What is growing on it?
Light brush
Mixed scrub
Dense trees
Heavy timber
Not sure
Can equipment get onto the land?
Equipment can drive on
Tight access
Steep or wet ground
Not sure
State (optional, for regional rates)
Answer the three questions above and the range appears here.
Your answers carry over — nothing to type twice. No signup to post.
Big parcel? Outline it on satellite, add photos and describe the finish — the project estimate.
SAFER PROPERTIES
Dead and leaning timber comes down before a storm decides for you.
CLEANER LAND
Brush mulched, stumps handled, debris where you want it — decided up front so every bid covers the same work.
LOCAL CREWS
Your parcel goes to clearing crews near you, who bid it. You pick one, or none.
TIMBER WITH VALUE
Mature trunks can be sold by sealed bid instead of paid to haul away.
What decides the price
Clearing is quoted per acre, and the honest answer is that the spread is enormous: an acre of light brush and an acre of mature hardwood on a slope are different jobs at the same size. Rather than show you an average that fits neither, timber.bid puts your actual parcel in front of local crews and lets them price it. The three things below move the number more than anything else.
What moves a clearing quote
What is standing on it
Light brush and saplings can be mulched in a pass. Mature trunks have to be felled, limbed and hauled, and each one is closer to a tree removal than to mowing. This is usually the single biggest factor, ahead of acreage itself.
Whether equipment can get on the land
A parcel a skid steer or mulcher can drive onto is cleared in a fraction of the time. Tight gates, soft ground, steep slopes or close neighbours push the work toward hand crews and smaller machines, and the price follows.
Where the material goes
Chipping and spreading on site is cheapest. Hauling everything away costs more, and stump removal and grading are separate line items — worth deciding before you ask for bids so every quote covers the same work.
What the timber is worth
On a wooded lot the logs can carry real value, and a crew that mills or sells them may offset your cost. It is rarely offered unless you ask, so ask every bidder whether log value comes off the price.
It depends far more on what is growing than on the acreage, which is why timber.bid does not quote a single number: an acre of light brush and a heavily wooded acre on a slope can differ by several times. Post the parcel and local crews bid the real price for your land.
Do I need a permit to clear my land?
Often yes, and it varies by state, county and sometimes by the individual lot — wetlands, protected species, steep-slope and tree-ordinance rules all commonly apply, and clearing near water is frequently regulated separately. Ask your county planning or building department before work starts. Reputable clearing companies deal with this routinely and will tell you what your parcel needs.
What is the difference between land clearing and forestry mulching?
Mulching grinds brush and small trees where they stand and leaves the chips on the ground as cover — fast, low-impact, no hauling, but it does not remove stumps or large trunks. Full clearing removes the material. Many jobs use both: mulch the brush, remove the big stems.
Can I sell the timber from my land?
Sometimes, and it is worth asking. Merchantable saw logs have real value and some crews will credit it against your bill or connect you with a mill. It depends on species, size, volume and how far the logs have to travel — mention the timber when you post the job so bidders price it in.
How long does clearing take?
A small lot with light brush can be a single day. Wooded acreage, difficult access or wet ground can run a week or more, and weather matters — crews avoid heavy machines on saturated ground because of the damage it does. Ask bidders for a window rather than a date.